After the floor there was a long list of all the final trim things that needed to be done:
The transom over the door:
(still need to sand off the wood filler from the nail holes...)
The window trim and window seat:
(Can't wait to put some books in there!)
More window trim:
(The cute little window that will one day look down into the kitchen...)
(trim done in the front window - cannot wait to tear those stickers off!)
Trim around the closet door:
And then these stairs, which we're in the midst of fixing up. Jeremy put in some new nails because some of the old ones kept coming up. I stepped on one a couple weeks ago and boy did that hurt! The stairs are so old it seems like the nail holes are stripped (if you will) so a couple bigger, longer nails did the trick.
You can see the paint job is also horrific. I'm guessing a UM fan lived here - aren't these the colors? Anyway, not only are the steps multi-colored, there are paint drips all over. The plan is to paint the whole thing one color, including the bit of trim on the sides. I think it will look fabulous.
For those wondering about the final inspection, it was actually supposed to happen last week. We were all set to do it, with a plan for getting the desk, more trim, and the railing in on time - and then we discovered the railing didn't comply with code! Grr - stupid code. So Jeremy is just going to build his own now. We delayed the inspection by a month and I'm hoping everything will get done by then! I can see the light at the end of the tunnel...